The entire installation was carried out by ISAV Energy. The photographs document the installed equipment, its placement on site and the internal arrangement of the equipment cabinet.

EPOD equipment is intended to reduce the formation of paraffin and other deposits in pipelines. This update presents the completed installation; operating results will be addressed separately once the monitoring data have been reviewed.